|
Product Detail :
|
Construction of 3 nos. of VUPs at Ayodhya Bypass from km.1353.120 to km.137.060 (Design Length- 1.940 km) of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode in Uttar Pradesh. (2nd Call)
|
| Tender Detail : |
Construction of 3 nos. of VUPs at Ayodhya Bypass from km.1353.120 to km.137.060 (Design Length- 1.940 km) of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode in Uttar Pradesh. (2nd Call) #*. Construction of 3 nos. of VUPs at Ayodhya Bypass from km.1353.120 to km.137.060 (Design Length- 1.940 km) of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode in Uttar Pradesh. (2nd Call) |