Product Detail :
|
Work of Construction of Uni-directional Tunnel i.e. length of 2.64/2.63km (Tube-1/Tube-2) and its approach road from Km 6+405 to Km 12+850 of total length 6.445km on Sudhmahadev- Daranga section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (SDII).
|